The commission : a flat for a couple with two children.
The place : last floor of a Haussmanian building; ancient servant’s bedrooms already transformed into a flat.
The project : is articulated around three connected and sequenced living spaces which are defined in function of uses, light and multiple views. Each one of these spaces is characterized by its solar orientation: East, West or South.
Each child has its own independent bedroom; the common living space is open and partitioned by elements of furniture which have all been designed so as to follow the sloping games of the roof-line, forming a landscape of “totems”. They include bookshelves and diverse storage spaces. A diagonal opening is thus drawn throughout the principal living room of which one forgets the rather tight initial dimensions. This reading of the apartment is further enhanced by the use of white paint on wood or plaster for the principle surfaces underlined by wood (oak) along the floor and for the “totem” elements.
Facts & Credits:
Program: Housing
Lieu:Paris (75)
Commissionner: Private
Architects: h2o architectes
Construction: Sarl Poluks
Mission: Complete
Specificity: Wood furnishings
Superficie: SHAB 70 m 2
Cost of works: 70.000 € TTC
Date: Spring 2015
![Archisearch - Project Section / Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-16-project-section.jpg)
![Archisearch - Project Plan / Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-05-project-plan.jpg)
![Archisearch - Previous Plan / Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-04-previous-plan.jpg)
![Archisearch - Axonometric View / Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-09-axon-view.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-26-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-24-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-23-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-22-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-21-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-20-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-19-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-15-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-08-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-12-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-06-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-01-chalmeau.jpg)
![Archisearch - Arsenal Flat / h2o architects](https://www.archisearch.gr/wp-content/uploads/old-site/h2oarchitectes-arsenal-010-chalmeau.jpg)
READ ALSO: STAIR-BOOKCASE FOR A PRIVATE HOUSE, MUSWELL HILL, LONDON / TAMIR ADDADI ARCHITECTURE